The geography is the thesis

Thirteen proposed sites, chosen for water and power

We publish these while they are still concepts because the siting logic — hydro power beside continental freshwater in a cold climate — is the entire argument, and it deserves scrutiny now, not after money is spent.

Proposed locations under evaluation

13

Design target All sites are conceptual. None has land, permits, power agreements, or funding.

Baie‑Comeau, QC Sept‑Îles, QC Churchill, MB Inuvik, NWT Tuktoyaktuk, NWT Norman Wells, NWT Dawson City / Dempster, YT Rankin Inlet, NU Baker Lake, NU Kangiqsujuaq, QC (Nunavik) Salluit, QC (Nunavik) Kuujjuaq, QC (Nunavik) Labrador City / Wabush, NL
Proposed sites
Site Power MW (initial–target) Adjacent water
Baie‑Comeau, QC Grid (Hydro‑Québec) 3–25 St. Lawrence Estuary
Sept‑Îles, QC Grid (Hydro‑Québec) 3–25 St. Lawrence Estuary
Churchill, MB Grid (Manitoba Hydro) 3–20 Churchill River estuary
Inuvik, NWT Remote (wind + BESS) 3–10 Mackenzie River
Tuktoyaktuk, NWT Remote (wind + BESS) 2–8 Beaufort Sea coast
Norman Wells, NWT Remote (in‑stream hydro) 2–7 Mackenzie River
Dawson City / Dempster, YT Remote (run‑of‑river) 2–6 Yukon River
Rankin Inlet, NU Remote (wind + BESS) 1–6 Hudson Bay coast
Baker Lake, NU Remote (wind + BESS) 1–5 Baker Lake
Kangiqsujuaq, QC (Nunavik) Remote (tidal) 1–6 Hudson Strait (hypertidal)
Salluit, QC (Nunavik) Remote (tidal) 1–5 Hudson Strait fjord
Kuujjuaq, QC (Nunavik) Remote (in‑stream/tidal) 2–8 Koksoak estuary
Labrador City / Wabush, NL Grid (Churchill Falls) 2–15 Smallwood Reservoir nearby

Live near one of these? Push back — or partner.

Feasibility starts with the communities these sites would touch. We would rather hear objections early than permits late.