Proposed sites / NL
Labrador City / Wabush, NL
A proposed hydro-adjacent AI data-centre location — a concept, evaluated for its geography: grid (churchill falls), beside smallwood reservoir nearby.
Design-target PUE
1.20
Capacity (proposed)
2→15MW
Grid intensity (proposed region)
30gCO₂/kWh
- Power
- Grid (Churchill Falls)
- Energy plan
- NL Hydro grid + BESS
- Initial capacity
- 2 MW
- Target capacity
- 15 MW
- Data halls
- 2
- Footprint (proposed)
- 2,200 m²
- Backhaul
- Regional fibre + FTTH providers
- Services
- Colo · GPU/HPC · Storage
- Adjacent water
- Smallwood Reservoir nearby
- River / lake system
- Churchill (Labrador)
- Site design
- Industrial siting; noise‑attenuated
Community commitments (proposed)
- Local hiring
- Training
These are intentions for future negotiation, not agreements. Nothing has been signed with any community, utility, or government.