Proposed sites / NU

Baker Lake, NU

A proposed hydro-adjacent AI data-centre location — a concept, evaluated for its geography: remote (wind + bess), beside baker lake.

Design-target PUE

1.20

Design target Power Usage Effectiveness — the ratio of total facility energy to IT energy. 1.20 is an aggressive cold-climate goal, not an operating result.

Capacity (proposed)

15MW

Grid intensity (proposed region)

25gCO₂/kWh

Power
Remote (wind + BESS)
Energy plan
Wind + BESS; KHFL tie‑in
Initial capacity
1 MW
Target capacity
5 MW
Data halls
1
Footprint (proposed)
1,400 m²
Backhaul
Interim satellite; KHFL later
Services
Colo · GPU/HPC · Storage
Adjacent water
Baker Lake
River / lake system
Thelon → Baker Lake
Site design
Tundra‑tone enclosures

Community commitments (proposed)

  • Local jobs
  • Training

These are intentions for future negotiation, not agreements. Nothing has been signed with any community, utility, or government.

Questions about this site?