Proposed sites / YT
Dawson City / Dempster, YT
A proposed hydro-adjacent AI data-centre location — a concept, evaluated for its geography: remote (run‑of‑river), beside yukon river.
Design-target PUE
1.20
Capacity (proposed)
2→6MW
Grid intensity (proposed region)
12gCO₂/kWh
- Power
- Remote (run‑of‑river)
- Energy plan
- Run‑of‑river + BESS
- Initial capacity
- 2 MW
- Target capacity
- 6 MW
- Data halls
- 2
- Footprint (proposed)
- 2,200 m²
- Backhaul
- Dempster Fibre Line; loop redundancy
- Services
- Colo · GPU/HPC · Storage
- Adjacent water
- Yukon River
- River / lake system
- Yukon
- Site design
- Small powerhouse; earth‑tone facade
Community commitments (proposed)
- Local procurement
- Training
These are intentions for future negotiation, not agreements. Nothing has been signed with any community, utility, or government.