A proposed hydro-adjacent AI data-centre location — a concept, evaluated for its geography: remote (run‑of‑river), beside yukon river.

Design-target PUE

1.20

Design target Power Usage Effectiveness — the ratio of total facility energy to IT energy. 1.20 is an aggressive cold-climate goal, not an operating result.

Capacity (proposed)

26MW

Grid intensity (proposed region)

12gCO₂/kWh

Power
Remote (run‑of‑river)
Energy plan
Run‑of‑river + BESS
Initial capacity
2 MW
Target capacity
6 MW
Data halls
2
Footprint (proposed)
2,200 m²
Backhaul
Dempster Fibre Line; loop redundancy
Services
Colo · GPU/HPC · Storage
Adjacent water
Yukon River
River / lake system
Yukon
Site design
Small powerhouse; earth‑tone facade

Community commitments (proposed)

  • Local procurement
  • Training

These are intentions for future negotiation, not agreements. Nothing has been signed with any community, utility, or government.