Proposed sites / NWT

Norman Wells, NWT

A proposed hydro-adjacent AI data-centre location — a concept, evaluated for its geography: remote (in‑stream hydro), beside mackenzie river.

Design-target PUE

1.20

Design target Power Usage Effectiveness — the ratio of total facility energy to IT energy. 1.20 is an aggressive cold-climate goal, not an operating result.

Capacity (proposed)

27MW

Grid intensity (proposed region)

15gCO₂/kWh

Power
Remote (in‑stream hydro)
Energy plan
In‑stream turbines + BESS
Initial capacity
2 MW
Target capacity
7 MW
Data halls
2
Footprint (proposed)
2,200 m²
Backhaul
MVFL PoP; LEO backup
Services
Colo · GPU/HPC · Storage
Adjacent water
Mackenzie River
River / lake system
Mackenzie
Site design
Submerged devices; minimal shore kit

Community commitments (proposed)

  • Equity
  • Training

These are intentions for future negotiation, not agreements. Nothing has been signed with any community, utility, or government.