Proposed sites / NWT
Inuvik, NWT
A proposed hydro-adjacent AI data-centre location — a concept, evaluated for its geography: remote (wind + bess), beside mackenzie river.
Design-target PUE
1.20
Capacity (proposed)
3→10MW
Grid intensity (proposed region)
20gCO₂/kWh
- Power
- Remote (wind + BESS)
- Energy plan
- Wind + BESS; in‑stream river pilot
- Initial capacity
- 3 MW
- Target capacity
- 10 MW
- Data halls
- 2
- Footprint (proposed)
- 2,600 m²
- Backhaul
- Canada North Fibre Loop; LEO backup
- Services
- Colo · GPU/HPC · Storage · DR
- Adjacent water
- Mackenzie River
- River / lake system
- Mackenzie → Beaufort Sea
- Site design
- Compact wind; camo towers; device retrieval in winter
Community commitments (proposed)
- Indigenous equity
- Youth internships
These are intentions for future negotiation, not agreements. Nothing has been signed with any community, utility, or government.