Proposed sites / MB
Churchill, MB
A proposed hydro-adjacent AI data-centre location — a concept, evaluated for its geography: grid (manitoba hydro), beside churchill river estuary.
Design-target PUE
1.20
Capacity (proposed)
3→20MW
Grid intensity (proposed region)
5gCO₂/kWh
- Power
- Grid (Manitoba Hydro)
- Energy plan
- MB Hydro grid + BESS
- Initial capacity
- 3 MW
- Target capacity
- 20 MW
- Data halls
- 2
- Footprint (proposed)
- 2,800 m²
- Backhaul
- Rail+port logistics; fibre providers
- Services
- Colo · GPU/HPC · Storage · DR
- Adjacent water
- Churchill River estuary
- River / lake system
- Churchill–Nelson
- Site design
- Setbacks from viewsheds; tundra‑tone facade
Community commitments (proposed)
- Jobs across port/DC ops
- Scholarships
These are intentions for future negotiation, not agreements. Nothing has been signed with any community, utility, or government.