Proposed sites / MB

Churchill, MB

A proposed hydro-adjacent AI data-centre location — a concept, evaluated for its geography: grid (manitoba hydro), beside churchill river estuary.

Design-target PUE

1.20

Design target Power Usage Effectiveness — the ratio of total facility energy to IT energy. 1.20 is an aggressive cold-climate goal, not an operating result.

Capacity (proposed)

320MW

Grid intensity (proposed region)

5gCO₂/kWh

Power
Grid (Manitoba Hydro)
Energy plan
MB Hydro grid + BESS
Initial capacity
3 MW
Target capacity
20 MW
Data halls
2
Footprint (proposed)
2,800 m²
Backhaul
Rail+port logistics; fibre providers
Services
Colo · GPU/HPC · Storage · DR
Adjacent water
Churchill River estuary
River / lake system
Churchill–Nelson
Site design
Setbacks from viewsheds; tundra‑tone facade

Community commitments (proposed)

  • Jobs across port/DC ops
  • Scholarships

These are intentions for future negotiation, not agreements. Nothing has been signed with any community, utility, or government.

Questions about this site?