Proposed sites / QC
Kuujjuaq, QC (Nunavik)
A proposed hydro-adjacent AI data-centre location — a concept, evaluated for its geography: remote (in‑stream/tidal), beside koksoak estuary.
Design-target PUE
1.20
Capacity (proposed)
2→8MW
Grid intensity (proposed region)
5gCO₂/kWh
- Power
- Remote (in‑stream/tidal)
- Energy plan
- Koksoak estuary hydrokinetic + BESS
- Initial capacity
- 2 MW
- Target capacity
- 8 MW
- Data halls
- 2
- Footprint (proposed)
- 2,200 m²
- Backhaul
- EAUFON hub (timeline); LEO backup
- Services
- Colo · GPU/HPC · Storage
- Adjacent water
- Koksoak estuary
- River / lake system
- Koksoak → Ungava Bay
- Site design
- Berms; low‑glare lighting
Community commitments (proposed)
- Equity
- Scholarships
These are intentions for future negotiation, not agreements. Nothing has been signed with any community, utility, or government.