Proposed sites / NWT

Tuktoyaktuk, NWT

A proposed hydro-adjacent AI data-centre location — a concept, evaluated for its geography: remote (wind + bess), beside beaufort sea coast.

Design-target PUE

1.20

Design target Power Usage Effectiveness — the ratio of total facility energy to IT energy. 1.20 is an aggressive cold-climate goal, not an operating result.

Capacity (proposed)

28MW

Grid intensity (proposed region)

20gCO₂/kWh

Power
Remote (wind + BESS)
Energy plan
Wind + BESS
Initial capacity
2 MW
Target capacity
8 MW
Data halls
2
Footprint (proposed)
2,200 m²
Backhaul
Fibre via Inuvik corridor; LEO backup
Services
Colo · GPU/HPC · Storage
Adjacent water
Beaufort Sea coast
River / lake system
Tundra lake systems
Site design
Off‑white turbines; setbacks

Community commitments (proposed)

  • Local jobs
  • Monitoring

These are intentions for future negotiation, not agreements. Nothing has been signed with any community, utility, or government.

Questions about this site?